Capitol Street & Frederick Douglass Bridge Visual Quality Manual - 2017

Wash_DC_CS_Bank_East_Day_2016-09-02a.jpg

Washington, DC 2017

David Gjertson – Urban Design Manager

Project includes urban design component for Capitol Street corridor approaches and surrounding streetscape and urban park system. Significant features includes: two 30 acre urban parks, connecting linear park system to the Anacostia River, Frederick Douglas Heritage Trail and all associated streetscape design leading into the Suitland Parkway area.

 
 
 
Wash_DC_2.jpg
FrDoug_graphic 2.JPG
 
SCS_VQC-3_FINAL 81.jpg